Gas cleaning systems — DWG. 2026 / JINAN WORKS

Wet scrubbers
engineered to spec.

Packed-bed towers, cross-flow scrubbers and acid-mist systems, calculated from your airflow and pollutant — then fabricated, water-tested and shipped in container sections.

Blueprint elevation of a packed-bed scrubber tower

Ø 400–4000 mm

1–3 packing stages

PP · PVDF · FRP

HCl — HF — NH₃ — SO₂ — H₂S — CrO₃ mist — acid fume — odor — VOC polishing — 1,000 to 100,000 m³/h — HCl — HF — NH₃ — SO₂ — H₂S — CrO₃ mist — acid fume — odor — VOC polishing — 1,000 to 100,000 m³/h —

100k

m³/h max airflow per tower

90–99%

typical soluble-gas removal

100%

towers water-tested before packing

24 h

sizing & quotation response

Product sheets 01–06

Six systems. One factory.

Sheet 01 — vertical tower

Vertical packed-bed spray tower

Packed-Bed Spray Towers

Counter-flow, 1–3 stages, demister top — the standard answer for acid fumes, NH₃ and odor.

1,000–100,000 m³/h · Ø0.4–4 m

Sheet 02 — cross-flow

Horizontal cross-flow scrubber

Cross-Flow Scrubbers

Multi-stage scrubbing in a low-profile housing for rooftops and tight mezzanines.

≤60,000 m³/h · H from 1.8 m

Sheet 03 — acid mist

Acid mist purification tower

Acid Mist Towers

Compact towers with integrated recirculation for pickling and plating lines.

HCl · H₂SO₄ · mixed acid

Sheet 04 — adsorption

Activated carbon adsorption unit

Carbon Adsorption

Drawer-type polishing for VOC and residual odor, standalone or after scrubbing.

0.2–10 m³ carbon · ΔP ports

Sheet 05 — dosing

Dosing and recirculation skid

Dosing & Recirculation

PP tanks, metering pumps and pH/ORP panels — pre-piped, pre-wired, wet-tested.

1–100 m³/h · auto pH/ORP

Sheet 06 — internals

Scrubber tower internals

Internals & Spares

Pall rings, nozzles, demisters and grating, molded in-house for any brand of tower.

rings 16–76 mm · to tower Ø

From inquiry to running scrubber

1

Gas data in
flow, pollutant, concentration

2

Sizing & quote
Ø, stages, fan duty, price — 24 h

3

Fabrication
welded from our own PP sheet

4

Water test
leak & spray pattern, documented

5

Ship & support
container sections, install guidance

Scrubbing duty across

Electroplating & anodizing

Acid pickling lines

Chemical & pharma

PCB & semiconductor

Wastewater odor

Food & rendering

Send your gas data.

airflow m³/h · pollutant · concentration → tower Ø, stages, fan duty, price — within 24 h

Scroll to Top